Intel R2000BB4GS9 Especificações Página 44

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 43
Hardware Installations and Upgrades
32 Intel
®
Server System R2000BB Service Guide
Figure 41. Installing Processor Remove the Cover
5. Close the Load Plate all the way as shown
Figure 42. Installing Processor Close the Load Plate
6. With your finger, push down on the load plate lever as shown. Close the socket lever and
ensure that the load plate tab engages under the socket lever when fully closed.
(see letter “B”).
Figure 43. Installing Processor Latch the Locking Lever
Installing Processor Heatsink(s)
1. Remove the protective film on the TIM if present (see letter “A”).
2. Align heatsink fins to the front and back of the chassis for correct airflow. Airflow goes from
front-to-back of chassis (see letter “B”).
Each heatsink has four captive fasteners and should be tightened in a diagonal manner using the
following procedure:
Vista de página 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 87 88

Comentários a estes Manuais

Sem comentários